ROOF REPLACEMENTS Staff Hotel $15,000.00
Main Bath/shower/laundry building $8,000.00
Cabin #3 $1,200.00
Cabin #10 $1,200.00
Chapel - one side $5,000.00
FOUNDATIONS Staff Hotel $3,000.00
Infirmary $1,000.00
POND Repair the water gate $1,500.00
Remove sediment (3' to 4')
LAKEHOUSE Renovate dorm room upstairs to add 4 beds
Install fire escape for new dorm room to town code
WATER SYSTEM Insulate the pump house or rebuild $1,200.00
Bury the water line from the pumphouse to storage tank $1,030.00
Insulate the storage tank $500.00
Bury the water line from the storage tank to the Lodge $2,270.00
LODGE Build and insulate attic space around water system $600.00
Install exhaust fan for dishwasher 12" 1/4 hr $300.00
New energy eff. windows 9 @ 46"x44" + 7 @ 42"x44" $2,100.00
Pipe-wrap insulation $600.00
SWIMMING POOL Replace the main drain $5,000.00
GROUNDS Install chain-link fence from Cabin #9 to Cabin #12